Learn all about our progress
Transparency is what we are most proud of at Sastal, so we want you to join us throughout the development process.
Forming and laying of material for hydraulic base with bench material for second stage
Forming and laying of material for hydraulic base with bench material for first stage
Enabling and cutting of ironwork for construction of metal structure of facade and access.
We are starting 2024 with a bang, beginning with the curbs on the sidewalks. On January 8, 2024, we will resume work with this new step.
We begin with the work of laying the pipe and the electric current records.
We started with the trenching work for the installation of the clean water and electricity pipes.
In August 2023, we began laying cables on power poles.
We started with the drilling and placement of poles for electric power.
The dirt roads of the first streets of the first and second stages of Sastal are formed.